George Best - Belfast City Airport
Location: Belfast
Architect: Building Design Partnership
M & E Consultant: Building Design Partnership
Main Contractor: Axor (Canada)
Mechanical Services Contratctor: Sharpe Mechanical Services
Ventilation Sub-contractor: Sharpe Ventilation Services Ltd
Mechanical Services Project Value: £1.4m
Programme: 30 Weeks
Standing within Shorts Bombardier’s site is the über modern George Best Belfast City Airport. This site has held a runway since 1937 and was Belfast’s first airport starting in 1938 until requisition by the Royal Navy at the beginning of World War II.
Visitors to Northern Ireland travelling through the airport are met with airy state of the art building which can be negotiated with ease even in these days of heightened security.
This included:
- Chilled Water installation including the provision of 2 rooftop chiller units.
- LPHW Gas Fired Heating
- Gas Fired Hot Water
- General Supply and Extract Ventilation including Gas Fired Air Handling Equipment
- Air – conditioning
- Plumbing and Soils & Wastes
- Sanitary Ware Installation
- Mechanical Controls Solution